SHT 00  ·  Featured build · Live on site

A £50k garden annex,
built from the ground up.

I'm Tasif Ahmed — a construction management graduate (BSc Hons, University of Greenwich, 2:1) — managing every stage of this build myself, from digging the foundations to the final finishes. Scroll down to see the build.

SHT 02  ·  Problems solved on site

Challenges & how I dealt with them

Real issues · real fixes
Drainage

Manhole inside the footprint

A drain inspection chamber (manhole) sat exactly where the annex needed to go, and building over it would have blocked access to the drains. I weighed up the options and moved it — dug down to the existing pipes, set a new chamber outside the building, re-laid the pipework with the right slope so everything still flows properly, and had it inspected before covering it back up.

Levelling

Site levels across the footprint

The garden sloped across the build area, which would have left the base sitting on uneven ground. I set a fixed level reference point and dug the whole area down to a consistent level, adjusting the foundation depths so the building sits on firm, even ground — and checked back against that reference at every stage.

Structure

Concrete reinforcement

The ground conditions meant plain concrete on its own wasn't enough. I added steel mesh reinforcement into the concrete — properly overlapped and lifted on spacers so it sits in the right place in the pour — making the foundations strong enough to carry the building without cracking.

Site efficiency

Trades timed in unison

A back-garden site, reachable only through a narrow alleyway, with nowhere to store materials. I planned the work so every trade followed straight after the last — carpenters starting the day the bricklayers finished — with deliveries timed to match. Comparing quotes properly saved about £4,000.

Building control

Inspection-ready at every stage

The build needs council building control sign-off at set points — foundations, damp-proofing, drainage, structure. I built those inspection dates into the programme and kept the site ready for each visit — trenches open, drains on test, paperwork to hand — and kept the inspector in the loop throughout, so every stage passed without holding up the build.

SHT 03  ·  Capability schedule

Skills & technologies

What I bring to a project team

Construction management

Planning and running the build

  • Programme scheduling
  • Construction planning
  • Contractor coordination
  • Cost management & procurement
  • Stakeholder communication

Contracts, quality & risk

Keeping the project safe and compliant

  • Contract administration — NEC & JCT
  • Quality control & defect prevention
  • Risk management
  • Health & safety compliance
  • UK Building Regulations

Digital construction

The tech behind the build

  • BIM — coordinated digital delivery
  • Navisworks — 4D simulation
  • AutoCAD & Revit
  • Microsoft Project — programming
  • Microsoft Excel — cost tracking
SHT 04  ·  Education record

Education

Verified on request
2023–2026
BSc (Hons) Construction Management — Upper Second-Class Honours (2:1)
University of Greenwich, London · Best results: Construction Management Practice (83%), Project & Risk Management (77%), Contract Law (74%)
Degree